Work done by a variable force Transitional Reasoning Download PDF
10 Physics practice questions on Work done by a variable force. Questions that build towards applied reasoning.
Questions
- 1.
A robotic positioning carriage moves along a straight horizontal track aligned with the -axis from to . An automated actuator exerts a two-dimensional, position-dependent force on the carriage given by , where force is in newtons and is in meters. How much work is done by this force on the carriage over this displacement?
- 2.
In a tribology experiment testing surface coatings, a 10 kg test block is propelled horizontally along a straight track from to . Due to a graded polymer coating, the coefficient of kinetic friction increases non-linearly with position according to , where is in meters. Taking the acceleration due to gravity as , what is the total work done by the friction force on the block over this displacement?
- 3.
A motorized tensioning rig pulls an offshore mooring line along a straight horizontal test track. The pulling force applied by the rig increases non-linearly with position according to , where is in newtons and is in meters. What is the total work done by this applied force on the line as its displacement increases from to ?
- 4.
During a high-speed track test, an autonomous vehicle travels along a straight horizontal path from to . An experimental engine provides a forward thrust given by , while a magnetic guide rail exerts an opposing resistive force given by , with both forces in newtons and in meters. What is the net work done on the vehicle over this displacement?
- 5.
During a vertical shaft inspection, a winch pulls up a freely hanging, uniform cable of mass 20 kg and total length 6.0 m onto a platform at constant speed. Because the mass of the hanging segment steadily decreases as the cable is retrieved, the lifting force varies with the retrieved length according to . Taking , how much work does the winch do to reel in the entire cable?
- 6.
An electromagnetic rail launcher applies a position-dependent horizontal driving force given by on a test sled, where is in newtons and is in meters. The sled starts from rest at and is propelled forward until the driving force drops to zero. How much work does the launcher perform on the sled during this propulsion phase?
- 7.
During a spacecraft docking simulation, an automated mechanism pushes a probe along a straight track against a repulsive magnetic force. The magnitude of this opposing force is given by , where is in newtons and is the separation distance in meters. How much work must the mechanism do on the probe to decrease the separation from to at constant speed?
- 8.
A deep-sea sampling probe uses a specialized non-linear elastic tether to deploy sensors smoothly. Calibration shows that the restoring force exerted by the tether depends on its stretch distance according to the relation , where force is in newtons and is in meters. How much work must an external mechanism do to stretch the tether from an initial extension of m to a final extension of m?
- 9.
During a safety certification test, a hydraulic ram compresses an industrial buffer along a straight track. The resistive force increases linearly with displacement according to from m to m, where force is in newtons and displacement is in meters, reaching a maximum force of 100 N. For the remainder of the compression from m to m, the buffer yields and maintains a constant resistive force of 100 N. What is the total work done by the hydraulic ram to compress the buffer from m to m?
- 10.
A prototype maglev carrier moves along a straight horizontal rail where an automated propulsion system exerts a position-dependent force parallel to displacement given by N, with position measured in meters. How much work is done by this variable force on the carrier as it travels from m to m?

